Effective Selection of Resources for Construction using Program Tool
G. Dhanasekar1, A. Sivakumar2, L. Madhumitha3, P. Karthikeyan4

1Mr. G. Dhanasekar*, Pursuing M.E Construction Engineering and Management, Department of Civil Engineering, Kongu Engineering College, Erode, Tamilnadu, India.
2Mr. A. Sivakumar, Assistant Professor, Department of Civil Engineering, Kongu Engineering College, Erode, Tamil nadu, India.
3Ms. L. Madhumitha, Pursuing M.E Construction Engineering and Management, Department of Civil Engineering, Kongu Engineering College, Erode, Tamilnadu, India.
4Dr. P. Karthikeyan, Assistant Professor, Department of Management Studies, Kongu Engineering College, Erode, Tamilnadu, India.
Manuscript received on January 26, 2020. | Revised Manuscript received on February 05, 2020. | Manuscript published on February 30, 2020. | PP: 2927-2931 | Volume-9 Issue-3, February 2020. | Retrieval Number:  C5411029320/2020©BEIESP | DOI: 10.35940/ijeat.C5411.029320
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper’s objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.
Keywords: Cost overrun, Time overrun, Program tool, Android mobile application.