Assessment And Feasibility Analysis Of Off-Grid Solar PV- Pico Hydro Hybrid System
Tapas Chhual Singh1, G R K D Satya Prasad2, Ch Saibabu3, Kali ch Rath4
1Tapas Chhual Singh, Asst. Professor in EE Department, GIET University, Gunupur, India.
2G R K D Satya Prasad , Department of EEE, GIET University, Gunupur , India.
3Sai Babu. Ch. Professor in EEE Department, JNTUK, Kakinada, India.
4Kali Charan Rath, Professor , Department of Mechanical Engineering, GIET University, Gunupur, India.
Manuscript received on July 20, 2019. | Revised Manuscript received on August 10, 2019. | Manuscript published on August 30, 2019. | PP: 2461-2464 | Volume-8 Issue-6, August 2019. | Retrieval Number: F8550088619/2019©BEIESP | DOI: 10.35940/ijeat.F8550.088619
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)
Abstract: As hydropower is one of the commonly available renewable energy sources, so it is experiencing a development in the large part of the world. Pico hydropower is used as a distributed system based renewable energy system meant for rural or remote area load . It is, hence, of most significant to propose an effective methodology to assure the better making reimbursement of a combined Pico hydro system with solar pv system. The proposed method mainly estimates the feasible of installing Pico hydropower in a run-of river. The Methodologies to assess the feasibility and sustainability of such mechanism were depicted. The orderly designing of plant is defined by considering some optimal technological method that considers the dimension of components plus the estimation of the gross energy generation. Economical plus Technical data studies performed to examine the profitability and practicability of the system. This planned method can be examined as a study and the feasibility of developing a PHP in a run of river system is possible. The environmental impact on fixing this plant measured and possibly reduced. This results obtained are demonstrated for already existing infrastructure and analyzed that the cost can be reduced by using an optimized model. A simulation result has obtained the financial expand is more by the technique used for the combine hydro-PV hybrid system. In Addition to the environmental impact and effect an analysis has exposed that yearly more than 200 tons of carbon emission is reduced by producing clean and green liveliness by means of the environmental and ecological solution.
Keywords: Feasibility analysis, HOMER software, Solar PV Pico Hydro system. I. INTRODUCTION.