Loading

Optimization of Bill of Quantities for Construction of Pre-Engineered Buildings
Balwant Kumar1, N.N. Harry2, Y.K. Bind3, R K Pandey4
1Balwant Kumar, Department of Civil Engineering, SAM Higginbottom Institute of Agriculture Technology and Sciences, Allahabad, India.
2N.N. Harry,  Assistant Professor Department of Civil Engineering, SAM Higginbottom Institute of Agriculture Technology and Sciences, Allahabad, India.
3Y.K. Bind,  Assistant Professor Department of Civil Engineering, SAM Higginbottom Institute of Agriculture Technology and Sciences, Allahabad, India.
4R K Pandey,  Professor Department of Civil Engineering, SAM Higginbottom Institute of Agriculture Technology and Sciences, Allahabad, India.
Manuscript received on September 26, 2013. | Revised Manuscript received on October 12, 2013. | Manuscript published on October 30, 2013. | PP: 99-101  | Volume-3, Issue-1, October 2013. | Retrieval Number:  A2165103113/2013©BEIESP

Open Access | Ethics and Policies | Cite
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Steel construction is considered as a process that involves many related activities. Pre-Engineered buildings steel parts are required to be installed in a specific order due to structural safety requirements and to the logical sequence of erection. Garnet shop is being constructed for the sand blasting of bogies. Sand blasting is a process for removing corrosion in iron before painting. In Paint shop painting work in trains after blasting has been done. After painting of bogies wheels will be attached in trains in this building. Bogie shop is the biggest building of the project. It is meant for attachment of shells and shaping it into bogie and after that attachment of bogies into each other of the train. In this shop machines and tools will be fitted in trains Shell store is constructed for the storage of shells brought here from other factories like Kapurthala. Shell means the cover part of the bogies. Transport shop is constructed for transportation purpose after complete finishing of the train. Transporting engine will come here and it will carry out the all new train from the rail coach factory.
Keywords: BOQ, Pre-Engineered Building, Rate Analysis.