Loading

Indoor Omnidirectional Antenna Network Planning using Capacity and Coverage Planning in Gandaria 8 Office Tower Building in PT Artisan Wahyu
Fauzi Furqon1, Fenny Auliyanti2, Rika Mayardi3, Haryadi Sarjono4

1Fauzi Furqon, Management Department, BINUS Business School Undergraduate Program, Bina Nusantara University, Jakarta, Indonesia.
2Fenny Auliyanti, Management Department, BINUS Business School Undergraduate Program, Bina Nusantara University, Jakarta, Indonesia.
3Rika Mayardi, Management Department, BINUS Business School Undergraduate Program, Bina Nusantara University, Jakarta, Indonesia.
4Haryadi Sarjono*, Management Department, BINUS Business School Undergraduate Program, Bina Nusantara University, Jakarta, Indonesia.
Manuscript received on July 02, 2020. | Revised Manuscript received on July 10, 2020. | Manuscript published on August 30, 2020. | PP: 109-112 | Volume-9 Issue-6, August 2020. | Retrieval Number: B2883129219/2020©BEIESP | DOI: 10.35940/ijeat.B2883.089620
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Planning to improve the signal condition of cellular telephone networks in a company is very important. PT. Artisan Wahyu is a company engaged in property and real estate. The purpose of this study was to determine the quality and strength of the signal beam at the Gandaria 8 Office Tower using the G-net Track Lite application, to determine the number of indoor omnidirectional antennas based on capacity planning method, and for determining the number of omnidirectional indoor antennas based on coverage planning method. The research method used is quantitative method with a descriptive type of research. By using the analysis method of Capacity Planning and Coverage Planning. Therefore, it is necessary to plan an omnidirectional indoor antenna analysis so that activities in communication can be enjoyed properly. From the results of the research conducted, there were four plans for omnidirectional indoor antenna networks for the 2nd floor based on capacity and coverage of 6 antennas. Whereas for the 22nd floor based on capacity as much as 3 and for coverage as many as five antennas so that the Coverage Planning method is recommended to be applied to the Gandaria Building 8 Office Tower. (FF, FA, RM).
Keywords: Capacity Planning, Coverage Planning, LTE Network, Planning Indoor.