Loading

Traffic Study on Road Links and Estimate the Fund required for Identified Road Improvement Projects in Major Urban Centre
T. Subraman
T. Subramani , Professor & Dean, Department of Civil Engineering, VMKV Engg College, Vinayaka Missions University, Salem, India.
Manuscript received on March 01, 2012. | Revised Manuscript received on March 17, 2012. | Manuscript published on April 30, 2012. | PP: 76-81 | Volume-1 Issue-4, April 2012 | Retrieval Number: D0269041412/2012©BEIESP
Open Access | Ethics and  Policies | Cite
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Salem is the fifth largest city with a population of 7.54 lakhs (2011) in Tamil Nadu. Local Authorities faced with great difficulties to identify required various road improvement projects. Repair or improvement works may have to be under taken on a basis which has to be decided based on socio-economic, administrative, technical, political factors etc., The identified road network selected for the study comprises 162 road links in Salem Corporation. Existing traffic condition, surface condition of carriageway, street lighting, footpath condition and drainage condition in the Salem Corporation area has been studied in detail. Traffic volume count survey was conducted on the idendified 162 road links in Salem Corporation. Identify the type of transport facilities required for the road links. In Salem Corporation area 44 road links required removal of onstreet parking and encroachment, 52 road links required widening of carriageway , 23 road links required traffic management measures with extrawidening to carry the existing traffic flow efficiently. Total fund required for identified various road improvement projects have been calculated as Rs.100.16 Crores. 
Keywords: Traffic, Road links, estimate, fund.