Loading

Optimization of Process Parameter by using CNC Wire Electrical Discharge Machine through Taguchi Method
Pankaj Sharma1, M. P. Singh2

1Dr. Pankaj Sharma*, Department of Mechanical Engineering, JECRC University, Jaipur (Rajasthan), India.
2Dr. M. P. Singh, Department of Mechanical Engineering, JECRC University, Jaipur (Rajasthan), India.
Manuscript received on August 07, 2020. | Revised Manuscript received on August 15, 2020. | Manuscript published on August 30, 2020. | PP: 518-522 | Volume-9 Issue-6, August 2020. | Retrieval Number: F1497089620/2020©BEIESP | DOI: 10.35940/ijeat.F1497.089620
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Wire Electrical Discharge Machining (WEPSPDM) is utilizedin industries to manufacture components of conductive strong metal with complicated shape, greater tolerance and precision. A review of the literature exposes that most of the research work has been intended for towards the optimization of WEDM operation and modeling of the process. Conventional wire electrode has been developed to a brass wire from a copper wire and finally to zinc coated wire on the brass, steel or copper wire core, by which more advanced WEDM, is realized in terms of better machining speed and accuracy. To examine the parameters likePeak Current (Ip), Time of Pulse ON (Ton), Time of Pulse OFF (Toff), etc. by the optimization of WEDM operation and modeling of the process during micro slit machining. Analyzed the results and optimize the process parameter conditions for maximum MRR (g/min), and surface roughness based on Taguchi’s Methodology. The ANOVA analysis indicates the significant factors for maximization of MRR, improvement of Surface Roughness and regression analysis. By the research work, it has been concluded that the MRR reduces with raise in Time of Pulse OFF (Toff) and Set Voltage of spark gap (SV) besides Material Removal Rate (MRR) increases with escalating in Time of Pulse ON (Ton) and PC (IP).
Keywords: WEDM, MRR, ANOVA,DOE, EDM