Loading

Modelling and Scheduling of Flexible Manufacturing System
K. Amarnath1, G. Sanjeev2, P. Surendernath3, V. Kumar4

1K. Amarnath, Assistant Professor, Kamala Institute of Technology and Science, Huzarabad, Karimnagar (Telangana), India.
2G. Sanjeev, Assistant Professor, Kamala Institute of Technology and Science, Huzarabad, Karimnagar (Telangana), India.
3P. Surendernath, Assistant Professor, Kamala Institute of Technology and Science, Huzarabad, Karimnagar (Telangana), India.
4V. Kumar, Assistant Professor, Kamala Institute of Technology and Science, Huzarabad, Karimnagar (Telangana), India.

Manuscript received on 18 December 2018 | Revised Manuscript received on 27 December 2018 | Manuscript published on 30 December 2018 | PP: 131-134 | Volume-8 Issue-2, December 2018 | Retrieval Number: B5542128218/18©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Production scheduling of an FMS is formulated as a multi-level integer program. The structure proposed includes machine loading, part input sequence and operation scheduling. Flexible manufacturing system is the better option to meet the effective utilization of resources, for which scheduling is the only solution. A simple numerical problem approach is proposed, and some computational results of simulation are analyzed and an attempt is made in arriving general conclusions.
Keywords: The Structure Proposed Includes Machine Loading,

Scope of the Article: Machine Learning