Loading

Improving The Assembly Process of Down lighter by using Two Hand Process Chart
Kajal Sejpal

Kajal Sejpal, Department of Industrial Engineering, Shri Ramdevaba College of Engineering and Management, Nagpur (Maharashtra), India.
Manuscript received on 13 April 2017 | Revised Manuscript received on 20 April 2017 | Manuscript Published on 30 April 2017 | PP: 204-209 | Volume-6 Issue-4, April 2017 | Retrieval Number: D4965046417/17©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The objective of this research is to improve the productivity by optimizing certain operations of the manual assembly process of a product in a manufacturing industry. By creating a standard process in manual assembly line time is saved as well as energy of the worker is also saved. This leads to increased units of production and lesser fatigue. In this paper, flow process chart of assembly line of a particular product is studied. The two hand process chart of selective time consuming operations is carried out. The time saved and improvement to the operations is noted thus improving the assembly process.
Keywords: Work Flow, Two Hand Process, Downlighter

Scope of the Article: Industrial Internet of Things (IIoT)